50t/h gold processing plant in Egypt

  • Applied materials: rock gold
  • Capacity: 50t/h
  • Main equipment: jaw crusher, cone crusher, ball mill, classifier, flotation machine
  • Location: Egypt

SHARE THIS:

Background

The Egyptian customer plans to develop local gold resources 映客直播 needs to build a gold processing plant with a processing capacity of 50 t/h to separate gold from the gold mine. The local gold mine is mainly rock gold with a low gold content 映客直播 complex ore properties, which requires both efficient separation 映客直播 cost control. The customer requires the production line to have the characteristics of high automation, low energy consumption 映客直播 high gold recovery rate.

Solutions

Based on the needs of customer, Zhongya Machinery Factory designed a gold flotation production line with the following process:

  • Crushing: The vibrating feeder evenly feeds the material into the jaw crusher for primary crushing. Then add a cone crusher as the second crushing process to obtain the appropriate particle size.
  • Grinding: The crushed material enters the ball mill through the vibrating screen 映客直播 is finely ground in the ball mill.
  • Separation: Then feed the slurry into the flotation machine, add chemicals, 映客直播 stir thoroughly to select the useful ore powder. Aerated by stirring, so that the mineral particles selectively fixed in the air bubbles; floating to the surface of the slurry is scraped out to form a foam product, the rest of the slurry is retained in the slurry.
  • Drying: The gold powder is sent into a desiccant for drying to obtain the desired substance.

Feedback

Zhongya Machinery Factory provides one-stop service for equipment installation, commissioning 映客直播 after-sales maintenance to ensure the continuous 映客直播 stable operation of the production line. The customer highly recognizes the professionalism of the solution.